我司受中交二航局第二工程有限公司委托,為馬來(lái)西亞SUKE CA4高速公路項(xiàng)目制作了中交集團(tuán)暨中國(guó)交建優(yōu) 質(zhì)工程獎(jiǎng)評(píng)選報(bào)獎(jiǎng)動(dòng)畫(huà)。
馬來(lái)西亞SUKE CA4高速公路項(xiàng)目由中國(guó)港灣工程有限責(zé)任公司總承包,中交二航局第二工程有限公司參與建設(shè),該項(xiàng)目擁有馬來(lái)西亞第一個(gè)標(biāo)志性的兩層螺旋坡匝道和距地56.4米跨越高速公路及MRT輕軌線的連續(xù)剛構(gòu)橋,也是當(dāng)?shù)厥?次采用預(yù)制小箱粱結(jié)構(gòu)設(shè)計(jì)的工程。
Entrusted by the Second Engineering Co., Ltd. of the Second Aviation Bureau of China Communications, our company produced the animation for the selection and award of the Quality Engineering Award of China Communications Group and China Communications Construction for the SUKE CA4 Expressway project in Malaysia.
Malaysia SUKE CA4 Expressway project by China Harbour Engineering Co., LTD., the construction of the second engineering Co., LTD., the project has Malaysia's first iconic two-storey spiral ramp and 56.4 meters above the ground across the highway and MRT light rail line continuous rigid frame bridge. It is also the first local project to adopt prefabricated small box girder structure design.